Design Partner Pilot

Sample trust artifact

See every cost claim
and what it rests on.

One report separates team-entered assumptions, defaulted screening scope, frozen calculations, cited public trend support, and the validation still required before reliance.

DealVetoCost-basis provenance report

Stonebridge Flats

4820 Stonebridge Dr · McKinney, TX · DV-1001

Screened
Aug 7, 2026
Report
report-1.0.0
Result basis
dvhi-2026.2-draft
Book hash
afd854bf

Illustrative sample — frozen DealVeto output built from seeded demo inputs and reviewed public-index snapshots. It is not a bid, GMP, local contractor estimate, or current market pricing claim.

01 Basis lineage

One frozen chain from input to decision output

A · Entered basis

$168/GSF

Team-entered screening assumption

B · Scope & reserves

7 items

Visible assumptions carried in the run

C · Frozen hard cost

$189/GSF

Engine output after carried scope

D · TDC / unit

$319,088

Calculated from the same frozen result

02 Material cost inputs

Entry, source, confidence, and review state

InputValueSourceConfidenceReview state
Hard $/GSF

Team-entered value; this sample does not claim external validation.

168Team-enteredhighEntered
Land

Team-entered value; this sample does not claim external validation.

11,500,000Team-enteredhighEntered
Sitework allowance

Defaulted sitework allowance; replace with civil scope when available.

7% of hard baseScreening assumptionlowNeeds validation
Parking allowance (surface)

Defaulted per-stall cost; replace with a parking takeoff when available.

$4,500 / stallScreening assumptionlowNeeds validation
Amenity allowance (pool / rooftop deck / club)

Conceptual amenity program (pool, rooftop deck, club, fitness). Carried as a hard-cost line, so it escalates and picks up GC fee, contingency, and soft cost. Replace with the real amenity scope when available.

$2,500 / unitScreening assumptionlowNeeds validation
Escalation

Defaulted hard-cost escalation reserve.

4.0%Screening assumptionlowNeeds validation
Contingency %

Team-entered value; this sample does not claim external validation.

6.0%Team-enteredhighEntered
GC fee %

Team-entered value; this sample does not claim external validation.

4.0%Team-enteredhighEntered

03 Frozen outputs

No browser-time deal calculation

Hard cost
$57,161,160
Hard cost / program GSF
$189/GSF
Hard cost / unit
$198,476/unit
Total development cost
$91,897,358
TDC / unit
$319,088/unit

04 Published calibration

DV-COST-2026-Q2.2 · as of 2026-06-30

U.S. Census Bureau

Multifamily construction price index

Census C30 Fisher price deflator

1.7%

2025 Q4
to 2026 Q1

Preliminary snapshot · US Government - public domain

U.S. Bureau of Labor Statistics

Residential construction inputs

WPUIP2311001

6.6%

2025 Dec
to 2026 Jun

Preliminary snapshot · US Government - public domain

U.S. Bureau of Labor Statistics

Private construction wages

CIU2022300000000I

1.8%

2025 Q4
to 2026 Q2

Published snapshot · US Government - public domain

Public series calibrate national time movement. Market, scope and contractor validation remain separate. These public signals explain time movement already embedded in the release; they are not applied again to this sample.

05 Open validation before reliance

What the deal team still has to prove

  1. 01Replace the entered hard-cost basis with current GC or preconstruction pricing and an explicit included/excluded scope.
  2. 02Replace default sitework, parking, amenity, escalation, contingency, and fee assumptions with project-specific takeoffs or written approvals.
  3. 03Validate local labor, procurement, schedule, and market conditions; public series support national time movement only.

Public indices are reviewed, cited context. They do not establish local installed cost. Team-entered inputs, screening assumptions, and calculated outputs remain separately labeled.

Sample · DV-1001:afd8